BUSINESS PROCESS WHEN APPLYING FOR NEW CONNECTION
Here`s for you to know of our business process if you are planning to apply for electric connection.
The applicant must attend first the Pre-Membership Seminar (PMS) being conducted at the CASURECO IV Multi-Purpose Building at Talojongon, Tigaon, Camarines Sur every Friday.
- After attending the PMS, the applicant should comply the requirements stated on the next slide
The Consumer Relations Advocacy Officer (CRAO) during his conduct of seminar shall provide information and instruction of the necessary requirements and how each will be complied.
- Qualified applications shall be endorsed to Housewiring Coordinator for inspection
Upon payment of Inspection Fee, application form with the necessary documents shall be scheduled for the conduct of house wiring inspection to determine that it is within the standard set forth by the Philippine Electrical Code (PEC), Energy Regulatory Commission (ERC), National Electrification Administration (NEA), and CASURECO IV policies
The inspector will determine if the applicant is compliant to stated standards. Otherwise, the applicant shall be guided to comply and qualify thereafter.
The applicant shall be informed of the length of service drop wires (SDW) to be used from the tapping point up to the household.
The inspector shall then submit the accomplished Inspection Report to the Consumer Data Coordinator (CDC) for processing and computation of necessary fees ready for connection/tapping.
- The applicant must secure clearances from the following:
- Financial Auditor (Audit)
- Accounts Analyst (Finance Services Department)
- Distribution Asset Management & System (DAMS) – Technical Services Department
- Institutional Services Department (Institutional Services Department)
- Pay the necessary fees enumerated at the application form
Once the applicant has already paid the fees, the Consumer Data Coordinator will prepare the Service Drop Connection Order or Turn-On Order and endorse to the Technical Services Department
- The linemen shall install the kwhr meter and energize the line
A copy of the accomplished Service Drop Connection (Turn-On Order) will be submitted to the Institutional Services Department (ISD) for inclusion of Member-Consumer-Owner (MCO) name at the list of New Members